Projects / Locomotive Recovery After a Derailment
Client
Canada National
Year
2018
Sector(s)
Civil Engineering
Service(s)
Engineering
Operated and non-operated crane rentals
Logistical Challenge
This was one of the most complex projects we have worked on. We needed to lift multiple railcars and two locomotives, each weighing over 200 tons, after a derailment. Our task was to propose the best method for recovering the locomotives.
The logistical challenge involved determining the best approach to recover the locomotives by delivering our crane via the railway. We had to plan an access route and a setup pad for our crane with input from our on-site team, project partners, and technical department. A 350-ton crane and two 130-ton cranes were transported by rail to assemble a 700-ton crane on-site.
Human Challenge
We faced extreme temperatures, ranging from -30°C to -40°C. All workers had to endure the cold to complete this mission. Operators had to maneuver the crane while lifting the locomotives on a slope, requiring meticulous planning and highly skilled operators.