You need to enable cookies to access this site
Projects / McInnis Cement
Client
McInnis Cement Plant
Year
2017
Sector(s)
Industrial
Service(s)
Engineering
Operated and non-operated crane rentals
GUAY was selected for this major project at the McInnis Cement Plant in Port-Daniel–Gascons, Quebec. Our task was to determine the appropriate lifting method and installation process for the equipment, creating lift sequences and plans using optimal cranes and accessories. The technical challenge involved utilizing high-capacity equipment in a confined space while respecting the ground’s load-bearing capacity. We also designed custom rigging to lift these massive components.
For the main crane, we chose a 440-ton Manitowoc 16000 crawler crane with the Max-er option, which increased its lifting capacity, allowing us to use an existing crane on-site and avoid the need for a 700-ton crane, resulting in significant cost savings for our client. We lifted a kiln piece weighing 618,000 lbs with a working radius of 30 feet. A 300-ton Manitowoc 2250 crane provided additional support. The lift was featured in International Cranes and Specialized Transport in September 2016. Thanks to our technical department and experienced on-site supervision, the project was a success.